US Automobile Giant Improves Mainframe Batch SLA from 32% to 99%

US Automobile Giant Improves Mainframe Batch SLA from 32% to 99%

Fortune 100 US Automobile ManufacturerAutomotiveNorth America18 months
$13.13M
5-year savings
99%
Batch SLA (from 32%)
67%
MIPS reduction
Faster batch cycle
Case study highlights

At a glance —
the essentials.

The Customer

Fortune 100 US Automobile Manufacturer

Industry: AutomotiveRegion: North AmericaDuration: 18 months
Mainframe ModernizationJCL to Java MigrationPerformance Engineering
Business Challenge
  • The client's mission-critical mainframe batch ecosystem was missing SLAs more than two-thirds of the time, throttling downstream manufacturing systems and delaying month-end financial close.
  • Years of incremental JCL changes had created an opaque, fragile dependency graph where any single failure required overnight manual recovery — driving up MIPS costs and operational risk.
Our Solution
  • Kumaran ran a full discovery sweep across thousands of JCL members, datasets, and scheduler triggers to rebuild an authoritative dependency map and prioritize the highest-impact jobs.
  • We migrated batch logic from JCL/COBOL to Spring Batch on Java, moving execution off the mainframe to a distributed Linux runtime — preserving exact business semantics through a parallel-run validation harness.
  • Performance engineering and intelligent re-sequencing of the job graph removed serial bottlenecks, while observability dashboards gave operations real-time SLA visibility for the first time.
Key Results
  • Batch SLA attainment jumped from 32% to a sustained 99%, eliminating overnight firefighting and unblocking downstream manufacturing and finance systems.
  • Mainframe MIPS consumption dropped by 67%, contributing to projected savings of $13.13M over five years on infrastructure and license costs.
  • End-to-end batch cycle time was cut by 3×, giving the business fresh data hours earlier each morning and enabling new analytics use cases.
The story so far

Go deeper —
download the PDF.

The downloadable report includes the complete technical narrative beyond the highlights above:

The full story

Want to know how we achieved these results?

Contact us today to learn more about our approach and the success story behind this engagement with Fortune 100 US Automobile Manufacturer.

Result delivered
$13.13M
5-year savings
Delivered for Fortune 100 US Automobile Manufacturer